Laserfiche WebLink
Test Method Developed By: <br />Page 3 of 6 <br />5. SECONDARY PIPE TESTING <br />X P1g maukaw ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />X Ptd <br />❑ Other (Specify) <br />❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: Liquid Filled Gauge 1% Dial Span Accuracy Equipment Resolution: 15 P.S.I. <br />Piping Run # So. DO Piping Run # No.Dsl Piping Run # Piping Run# <br />Material: Fiberglass Fiberglass <br />r�pj!ng <br />Manufacturer: <br />AO Smith <br />AO Smith <br />Piping Diameter: <br />3" <br />4" <br />Length of Piping Run: <br />30' <br />10' <br />Product Stored: <br />Diesel <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Smith Isolation Test <br />Boot / Turbine Sump <br />Smith Isolation Test <br />Boot / Turbine Sum <br />Wait time between applying <br />pressumiracumatwater and <br />starting test: <br />15 Minutes <br />15 Minutes <br />Test Start Time: <br />0830 <br />0830 <br />Initial Reading W: <br />5 P. S.I. <br />5 P. S.I. <br />Test End Time: <br />0930 <br />0930 <br />Final Reading (RF): <br />5 P. S.I. <br />5 P. S.I. <br />Test Duration: <br />I Hour <br />1 Hour <br />Change in Reading (RF -RI): <br />0 P. S.I. <br />0 P. S.I. <br />Pass/Fail Threshold or <br />Criteria: <br />0 P. S.I. <br />0 P. S.I. <br />Test Result: <br />X Fat ❑ Fail <br />X Pm ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />