My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2002-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 10:16:48 AM
Creation date
6/23/2020 6:52:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2008
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2002-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 6 <br />6. PIPING SUMP TESTING <br />Test Method Developed By: <br />❑ Sump Manufacturer <br />X hdaMy SMOdatd <br />❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />0 Pressure <br />❑ Vacuum <br />X HydMalfic <br />❑ Other (Specify) <br />Test Equipment Used: INCON TS -STS V2.1 <br />Equipment Resolution: 0.0000" <br />Sump # So. Tur <br />Sump # No. Tur Sump # <br />Sump # <br />Sump Diameter: <br />36" <br />36" <br />Sump Depth: <br />60" <br />60" <br />Sump Material: <br />Fiberglass <br />Fiberglass. <br />Height from Tank Top to Top of <br />14" <br />14" <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />20" <br />24" <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Clean / Dry <br />Clean / Dry <br />Portion of Sump Tested' <br />2" Above Highest <br />2" Above Highest <br />Piping Penetration <br />Piping Penetration <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />X Yeas 0 No ❑ NA <br />X Yts ❑ No ❑ NA <br />product and water)?` <br />Turbine shutdown response time <br />8 Seconds <br />8 Seconds <br />Is system programmed for fail-safe <br />shutdown?" <br />X Yes ❑ No ❑ NA <br />X Y+s ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational? ` <br />X Yq ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />15 Minutes <br />15 Minutes <br />test: <br />Test Start Time: <br />8:35 / 8:52 <br />8:35 / 9:12 <br />Initial Reading <br />4.5919"/ 4.5917" <br />5.6099P'/ 5.6055" <br />Test End Time: <br />8:50 / 9:07' <br />8:50 / 9:27 <br />Final Reading (RF): <br />4.5919" / 4.5917" <br />5.6096" / 5.6036" <br />Test Duration: <br />15 Minutes * 2 <br />15 Minutes * 2 <br />Change in Reading (RF-Ri): <br />0.0000" / 0.0000" <br />0.0003" / 0.0019" <br />Pass/Fail Threshold or Criteria: <br />0.0020" <br />0.0020" <br />Test Result: <br />X Ptm ❑ Fail <br />X lel ❑ Fail <br />Was sensor removed for testing? <br />X Yes ❑ No DNA <br />X Yes 0 No ❑ NA <br />Was sensor properly replaced and <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follaw-up for failed tests) <br />All Hydrostatic Test Performed Twice To Ensure Testinp- Results. <br />` If the entire depth of the sump is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NU' or "NA", the entire sump must be tested (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.