My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2002-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 10:16:48 AM
Creation date
6/23/2020 6:52:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2008
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2002-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 6 <br />8. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ SpilI Bucket Manufacturer X hdoWy SMadard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum X HY&OStI is <br />❑ Other (Specify) <br />Test Equipment Used: INCON TS -STS V2.1 Equipment Resolution: 0.0000" <br />Spill Box # TI Fill Spill Boz # Spill Box # Spill Box # <br />Bucket Diameter: 12" <br />Bucket Depth: <br />16" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 Minutes <br />Test Start Time: <br />8:35 /8:52 <br />Initial Reading (R1): <br />6.1488" / 6.1488" <br />Test End Time: <br />8:50 / 9:07 <br />Final Reading (Ry): <br />6.1489" 16.1490" <br />Test Duration: <br />15 Minutes * 2 <br />Change in Reading (RF -RI): <br />0.000 P' / 0.0002" <br />Pass/Fail Threshold or <br />Criteria: <br />0.0020" <br />Test Result: <br />X Pam ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />All Hydrostatic Test Performed Twice To Ensure Testiniz Results. <br />
The URL can be used to link to this page
Your browser does not support the video tag.