Laserfiche WebLink
0 • Page 3 of 6 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: X Pipe lulmbodm ❑ industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: X P ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />lest equipment Used: Liquid roved Gauge i ze Llai Span <br />1111 IN- Piping Run # So. Dsl <br />Piping Material: Fiberglass <br />Accuracy r-quipnem mesumuon: <br />Piping Run # No. Dsl Piping Run # <br />Fiberglass <br />is r.a.m. <br />Piping Run# <br />Piping Manufacturer: AO Smith <br />AO Smith <br />Piping Diameter: 3" <br />4" <br />Length of Piping Run: 30' <br />10' <br />Product Stored: Diesel <br />Diesel <br />Method and location of Smith Isolation Test <br />piping -run isolation: Boot / Turbine Sump <br />Smith Isolation Test <br />Boot / Turbine Sump <br />Wait time between applying <br />premue/vacuum/water and 15 Minutes <br />starting test: <br />15 Minutes <br />Test Start Time: 0830 <br />0830 <br />Initial Reading (Fj: 5 P.S.I. <br />5 P.S.I. <br />Test End Time: 0930 <br />0930 <br />Final Reading (RF): 5 P.S.I. <br />5 P.S.I. <br />Test Duration: 1 Hour <br />1 Hour <br />Change in Reading (RF -RI): 0 P.S.I. <br />0 P.S.I. <br />Pass/Fail Threshold or 0 P.S.I. <br />Criteria: <br />0 P.S.I. <br />Test Result. X ❑ Fail <br />X PM ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />