My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2002-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 10:16:48 AM
Creation date
6/23/2020 6:52:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2008
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2002-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • Page 3 of 6 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: X Pipe lulmbodm ❑ industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: X P ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />lest equipment Used: Liquid roved Gauge i ze Llai Span <br />1111 IN- Piping Run # So. Dsl <br />Piping Material: Fiberglass <br />Accuracy r-quipnem mesumuon: <br />Piping Run # No. Dsl Piping Run # <br />Fiberglass <br />is r.a.m. <br />Piping Run# <br />Piping Manufacturer: AO Smith <br />AO Smith <br />Piping Diameter: 3" <br />4" <br />Length of Piping Run: 30' <br />10' <br />Product Stored: Diesel <br />Diesel <br />Method and location of Smith Isolation Test <br />piping -run isolation: Boot / Turbine Sump <br />Smith Isolation Test <br />Boot / Turbine Sump <br />Wait time between applying <br />premue/vacuum/water and 15 Minutes <br />starting test: <br />15 Minutes <br />Test Start Time: 0830 <br />0830 <br />Initial Reading (Fj: 5 P.S.I. <br />5 P.S.I. <br />Test End Time: 0930 <br />0930 <br />Final Reading (RF): 5 P.S.I. <br />5 P.S.I. <br />Test Duration: 1 Hour <br />1 Hour <br />Change in Reading (RF -RI): 0 P.S.I. <br />0 P.S.I. <br />Pass/Fail Threshold or 0 P.S.I. <br />Criteria: <br />0 P.S.I. <br />Test Result. X ❑ Fail <br />X PM ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.