Laserfiche WebLink
Test Method Developed By: <br />• • Page 4 of 6 <br />6. PIPING SUMP TESTING <br />❑ Sump Manufacturer X bdoWy SUndard <br />❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum X Hydmswk <br />❑ Other (Specify) <br />Test Equipment Used: INCON TS -STS V2.1 <br />Sump # So. Tur Sump # No. Tur <br />Sump Diameter: 36" 36" <br />Equipment Resolution: 0.0000" <br />Sump # Sump # <br />Sump Depth: 60" <br />60" <br />Sump Material: Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of 14" <br />Highest Piping Penetration: <br />14" <br />Height from Tank Top to Lowest 20" <br />Electrical Penetration: <br />24„ <br />Condition of sump prior to testing: Clean / Dry <br />Clean / Dry <br />Portion of Sump Tested' 2" Above Highest <br />Piping Penetration <br />2" Above Highest <br />Piping Penetration <br />Does turbine shut down when <br />sump sensor detects liquid (both X Yto ❑ No ❑ NA <br />product and water)?' <br />X Yes ❑ No ❑ NA <br />Turbine shutdown response time 8 Seconds <br />8 Seconds <br />Is system programmed for fail-safe <br />shutdown? X Y#s ❑ No ❑ NA <br />X Y+rs ❑ No ❑ NA <br />Was fail-safe verified to be X Yea ❑ No ❑ NA <br />operationaff <br />X Yes ❑ No ❑ NA <br />Wait time between applying <br />pressurelvacuum/water and starting 15 Minutes <br />test: <br />15 Minutes <br />Test Start Time: 8:35 / 8:52 <br />8:35 / 9:12 <br />Initial Reading (R): 4.5919"/ 4.5917' <br />5.6099" / 5.6055" <br />Test End Time: 8:50 J 9:07" <br />8:50 / 9:27 <br />Final Reading (RF): 4.5919" / 4..5917" <br />5.6096" / 5.6036" <br />Test Duration: 15 Minutes * 2 <br />15 Minutes * 2 <br />Change in Reading (RF414): 0.0000" / 0.0000" <br />0.0003" / 0.0019" <br />Pass/Fail Threshold or Criteria: 0.0020" <br />0.0020" <br />Test Result: X No ❑ Fail <br />X fast ❑ Fail <br />Was sensor removed for testing? X Yes ❑ No ❑ NA <br />X Ycs ❑ No ❑ NA <br />Was sensor properly replaced and X Yes ❑ No ❑ NA <br />verifiers functional after testing? <br />X Yea ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />All Hydrostatic Test Performed Twice To Ensure Testinp- Results <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />