My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:56:31 PM
Creation date
6/23/2020 6:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0231871
PE
2361
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
Rd
City
Stockton
Zip
95207
APN
077-470-07
CURRENT_STATUS
01
SITE_LOCATION
907 W Lincoln Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231871_907 W LINCOLN_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.PIPING SUMP TESTING <br /> Test Method Developed By: F Sump Manufacturer F Industry Standard F Professional Engineer <br /> F Other(Specify) <br /> Test Method Used: F Pressure r Vacuum F71 Hydrostatic <br /> F Other(Specify) <br /> Test Equipment Used: Incon TS-STS Equipment Resolution: .0006 <br /> Sump Sump Su mp Sump <br /> UE046UO02 <br /> Sump Diameter: 44" <br /> Sump Depth: 56" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 20" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 15" <br /> Electrical Penetration: <br /> Condition of sump prior to Good <br /> testing : <br /> Portion of Sump Tested(1) 2" above high pen <br /> Does turbine shutdown when <br /> sump sensor detects liquid(both F Yes I No NA r Yes 1 No I NA Yes i No NA r 7r Yes A No I NA <br /> product and water)?* <br /> Turbine shutdown response time NA <br /> Is system programmed for fai I- g� <br /> safe shutdown?* F Yes r g <br /> No 0�' gNA d Yes F No I NA F Yes 1r Nor <br /> NA F Yes& No 1 NA <br /> Was fail-safe verified to be r p- p— g— ¢— p— <br /> operational?* Yes 7 No P NA I Yes P No& NA Yes No[ NA Yes 9 No I NA <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min. <br /> starting test: <br /> Test Start Time: 10:59 am 11:15 am <br /> Initial Reading(Rr): 3.9815 3.9818 <br /> Test End Time: Imi <br /> 11:30 am <br /> Final Reading(RF): 3.9813 <br /> Test Duration: 15 min. <br /> Change in Reading(RF'R j): .0005 <br /> Pass/Fai l Threshold or Criteria: .002 <br /> Test Result: FPass F Fail F Pass r Fail F Pass F Fail F Pass F Fail <br /> re1- rp <br /> Was sensor moved for testing? <br /> Yes No f NA ! Yes I No F NA F Yes I No r NA F Yes F No F NA <br /> Was sensor properly replaced and �-. F r-- �— r r— <br /> verified functional after testing? Yes V No NA Yes No NA Yes No NA Yes No NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> The sensor was reinstalled to the lowest point,but not tested. <br /> l <br /> 4 <br /> 1 <br /> (1)Ifthe entire depth of the sump is not tested,specify how much was tested. Ifthe answer to any of the questions indicated <br /> with an asterisk(*)is"NO"or"NA",the entire sump must be tested.(See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.