Laserfiche WebLink
D.Results of Testing/Servicing <br /> Software Version Installed: 121.00 <br /> Complete the following checklist: <br /> ti <br /> F Yes No* Is the audible alarm operational? <br /> fv—' Yes F No* Is the visual alarm operational? <br /> 1 � <br /> Yes F No* Were all sensors visually inspected,functionally t ested,and confirmed operational? <br /> F.' e * Were all sensors installed at lowest point of secondary containment <br /> No , ..�=_ e.w.. r.._ - _ <br /> _ <br /> � � Yes � m p Y and positioned so that other equipment � <br /> will not interfere with their <br /> ro r oeration? <br /> Yes i No* 'If alarms are relayed to a remote monitoring station, is all communications equipment(e.g.modem) <br /> F N/A operational? <br /> Yes No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary <br /> N/A containment monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which <br /> sensors initiate positive shirt-down? (Check all that apply) <br /> Sump/Trench Sensors; FDispenser Containment Sensors. Did you confirm positive shut-down <br /> due to leaks and sensor failure/disconnection? <br /> Yes; f— No. <br /> * For tanks stems that utilize the monitoring s stem as the primary tank ove�ll wamin de <br /> � Yes No Y g Y p � Y g vice(i.e. no <br /> mechanical overfill prevention valve is installed),is the overfill waming alarm visible and audible at the <br /> N/A tank fill point(s) and operating properly?If so,at what percent of tank capacity does the alarm trigger? <br /> F Yes* F' No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment 3 <br /> replaced and list the manufacturer name and model for all replacement parts in Section E below <br /> . <br /> - __- ,. .�,. ..... „_ ......_ <br /> * � apply) � Product; aWater.If yes,describe causes in Section E,below. systems? <br /> Yes r Noinsideany Y Y Sri Y (Check all that ; <br /> F Yes F No* Was monitoring system set-up reviewed to ensure proper settings. Attach set up reports,if applicable <br /> Yes No* E Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section below,describe how and when these deficiencies were or will be corrected <br /> E. Comments: <br /> The drop tube is equipped with a mechanical overfill prevention valve. <br />