Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: <br /> Check this box if tank gauging is used only for inventory control. <br /> F Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> F Yes F No*f <br /> all input wrong been inspected for proper entry and termination including testing for ground faults? <br /> F Yes r No* re all tank gauging probes visually inspected for damage and residue buildup? <br /> .. �_.... ,__.. _ �.... _.._ ....._ �w _.. ..._I� <br /> Yes No* s accuracy of system product level readings tested? <br /> Yes F No* s accuracy of system water level readings tested. <br /> Yes F No* re all probes reinstalled properly? <br /> . _..,.....,x _.,,.,..Yes � No* re all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes • No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance?(Check <br /> • N/A all that apply) Simulated leak rate r 3 gp h F 0.1 g.p.h F 0 2 g p h <br /> Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> F Yes F No* Was the testing apparatus properly calibrated? <br /> YesNY F No*H For mechanical LLDs,does the LLD restrict product flow if it detects att_.... � �.._.__...._.......... ...._.._,_ ._._. __.._..., <br /> leak? <br /> € F N/A <br /> o* For electronic LLDs, does the turbine automatically shut off if <br /> Yes � No y the LLD detects a leak? <br /> F N/A <br /> • :ee - _ ;" . .. .. <br /> Yes F No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> FN/A disconnected? <br /> .. . <br /> Yes F No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> N/A fails a test? <br /> Yes F No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> r Yes F No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected <br /> H. Comments: <br /> Suction System <br />