Laserfiche WebLink
F.In-Tank Gauging/SIR Equipment: <br /> Check this box if tank gauging is used only for inventory control. <br /> * Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist <br /> Yes No* Has all input wrong been inspected for proper entry and termination including testing for ground faults? <br /> * Were all tank gauging probes visually inspected for damage and residue buildup? <br /> , m _. . <br /> Lr_— Yes No <br /> Yes F No* Was accuracy of system product level readings tested? <br /> Yes No* Was accuracy of system water level readings tested? ? <br /> F Yes No Were all probes reinstalled properly? <br /> Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): ' Check this box if LLDs are not installed. <br /> Complete the following checklist <br /> * <br /> Forequipment start-u,,.or a�.� <br /> Yes F No p nnual equipment certification,was a leak simulated to verify LLD performance?(Check <br /> F <br /> F N/A <br /> all that apply)Simulated leak rate: 3 gp.h.; 0.1 g.p.h; F' 0.2 g.p.h. <br /> ... <br /> F Yes F No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes _ �.:.... <br /> IJ <br /> No* Was the testing apparatus properly calibrated? <br /> Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> F' N/A <br /> * For electronic LLDs,does the turbine auto <br /> Yes � No automatically shut off if the LLD detects a leak? <br /> N/A <br /> * For electronic LLDs,does the turbine automaticallyshut off if a yµM vW ftmonitoring <br /> _ ito i <br /> F Yes Fx No_ any portion of the monitoring system is disabled or ? <br /> N/A <br /> disconnected? <br /> lic LLDdoes the turbine automatically shut off if any portion of the monitoring system m <br /> � Yes � No* For electronic s, malfunctions or <br /> N/A fails a test? <br /> Yes r No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> F Yes F No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Suction System. <br />