Laserfiche WebLink
UST Monitoring Site Phan <br /> Site Address : '907 LINCOLN RD.,Stockton,95207 <br /> Monitoring Plan Site Map <br /> a <br /> Drawing NOT to Scale <br /> business Name- Pacific Be#Teleph�re Co. dha AW;Cal. WEC 4b) <br /> Business address: 907 Uncok�Rd. S`:ock on <br /> Pt.!rgar ss:' FL121 tires <br /> 7rs4?8J-Ha <br /> 7943,Ru 25�, <br /> 7S43"SO 42u � <br /> R US 31_sei — �or.M <br /> t� € <br /> t <br /> G <br /> AT&T building <br /> W <br /> +N <br /> E <br /> Date map was drawn: 4/4/2012 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System <br /> Certification. On your site plan,show the general layout of tanks and piping.Clearly identify locations of the following equipment,if <br /> installed:monitoring system control panels; sensors monitoring tank annular spaces, sumps,dispenser pans,spill containers, or other <br /> secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level probes(if used for leak detection).In the <br /> space provided,note the date this Site Plan was prepared. <br />