My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:56:31 PM
Creation date
6/23/2020 6:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0231871
PE
2361
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
Rd
City
Stockton
Zip
95207
APN
077-470-07
CURRENT_STATUS
01
SITE_LOCATION
907 W Lincoln Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231871_907 W LINCOLN_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page 2 of 5 <br />4. TANK ANNULAR TESTING <br />Test Method Developed by ❑ Tank Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used ❑ Pressure ® Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: 4" dial guage Equipment Resolution: .2 <br />Tank # UE046UO02 Tank # Tank # Tank # <br />Is Tank Exempt From Testing? (►) <br />❑ Yes ® No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />Tank Capacity: <br />4010 Gat <br />Tank Material: <br />Steel/Clad <br />Tank Manufacturer: <br />Modem Welding <br />is oduc;t Stored: <br />Diesel <br />Wait Time between applying <br />pressure/vacuum/water and starting <br />test: <br />15 min <br />Test Start Time: <br />9:30 am <br />Initial Reading (Ri): <br />-10" HG <br />Test End Time: <br />10:30 am <br />Final Reading (Rf): <br />-10" HG <br />Test Duration: <br />I Hour <br />Change in Reading (Rf - Ri): <br />0 <br />PasslFail Threshold or Criteria: <br />0 <br />Test Result <br />0 Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was Sensor Removed for Testing? <br />® Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was Sensor properly replaced and <br />verified functional after testing? <br />❑ Yes ® No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Continents include any information on repairs made prior to testing, and recommended follow-yfor failed tests <br />Sensor reinstalled to low point but not tested. <br />(1) Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as <br />sysrtems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. ;California Code of <br />Regulations, Title 23, Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.