Laserfiche WebLink
SWRCB, January 2002 Page 3 of 5 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed by ❑ Piping Manufacturer i8! Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: 4" Gauge Equipment Resolution: .1 <br />Piping Run # Sup/Ret Piping Run # Piping Run # Piping Run # <br />UE046UO02 <br />Piping Material: <br />Poly <br />T <br />Piping Manufacturer: <br />EnviroFlex <br />Piping Diameter: <br />3" <br />Length of Piping Run: <br />100, <br />Product Stored: <br />Diesel <br />Method and location of piping -run <br />isolation: <br />Test Boot <br />Wait Time between applying <br />pressure/vacuum/water and starting <br />test: <br />15 min <br />Test Start Time: <br />9:30 am <br />Initial Reading (Ri): <br />5 PSI <br />Test End Time: <br />10:30 am <br />Final Reading (Rf): <br />5 PSI <br />Test Duration: <br />1 Hour <br />Change in Reading (Rf - Ri): <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 <br />Test Result <br />® Pass ❑ Fall <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests <br />