My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:56:31 PM
Creation date
6/23/2020 6:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0231871
PE
2361
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
Rd
City
Stockton
Zip
95207
APN
077-470-07
CURRENT_STATUS
01
SITE_LOCATION
907 W Lincoln Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231871_907 W LINCOLN_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: <br /> 0 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com Tete the followin2 checklist: <br /> ❑Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> MMENNIMEMM <br /> ❑Yes ❑No* were all tank gauging probes visually inspected for damage and residue buildup? <br /> OffiffiRMOMMEM <br /> ❑Yes ❑No* was accuracy of system product level readings tested? <br /> IMMOMEMEMM <br /> ❑Yes ❑No* was accuracy of system water level readings tested? <br /> MON <br /> ❑Yes ❑No* were all probes reinstalled properly? <br /> so <br /> ❑Yes ❑No* were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how andwhen these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): Q Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑Yes ❑No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check <br /> ❑N/A all that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑Yes ❑No* were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑Yes ❑No* was the testing apparatus properly calibrated? <br /> ❑Yes ❑No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ❑N/A disconnected? <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑N/A tai is a test? <br /> ❑Yes ❑No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑N/A <br /> ❑Yes ❑No* were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Suction System. RECEIVED <br /> X521 <br /> PE "T/SER VICES r <br />
The URL can be used to link to this page
Your browser does not support the video tag.