Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: <br /> 0 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com Tete the followin2 checklist: <br /> ❑Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> MMENNIMEMM <br /> ❑Yes ❑No* were all tank gauging probes visually inspected for damage and residue buildup? <br /> OffiffiRMOMMEM <br /> ❑Yes ❑No* was accuracy of system product level readings tested? <br /> IMMOMEMEMM <br /> ❑Yes ❑No* was accuracy of system water level readings tested? <br /> MON <br /> ❑Yes ❑No* were all probes reinstalled properly? <br /> so <br /> ❑Yes ❑No* were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how andwhen these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): Q Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑Yes ❑No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check <br /> ❑N/A all that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑Yes ❑No* were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑Yes ❑No* was the testing apparatus properly calibrated? <br /> ❑Yes ❑No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ❑N/A disconnected? <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑N/A tai is a test? <br /> ❑Yes ❑No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑N/A <br /> ❑Yes ❑No* were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Suction System. RECEIVED <br /> X521 <br /> PE "T/SER VICES r <br />