Laserfiche WebLink
UST Monitoring Site Plan <br /> Site Address : 907 Lincoln Rd. Stockton 95207 <br /> le atv Monitoring ' n Site Map <br /> Drawing NOT to Scale <br /> Business Name: Pacific Bell Telephone Co. dbaAT&T Cal. (UE046) <br /> Business Address: 907 Lincoln Fid. Stockton <br /> Piping Sump / Sensor Fuel Lines <br /> 794380-208 <br /> Fill Sump /Sensor Overfill Alarm <br /> 794380-Z8 <br /> Annular Sensor <br /> 794390-420 --- <br /> 4K UST Diesel - -- TLS 350 Flus <br /> r on '1st floor <br /> Engine Room <br /> Vent Riser�: <br /> 0 <br /> 0 <br /> c� <br /> J <br /> AT&T building <br /> W <br /> S RECEIVED <br /> N <br /> FEB15 2017 <br /> E <br /> PERMIT/SEWCES <br /> Date map was drawn: 2/3/2017 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it, rather than this page,with your Monitoring System <br /> Certification. On your site plan,show the general layout of tanks and piping.Clearly identify locations of the following equipment, if <br /> installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans,spill containers,or other <br /> secondary containment areas; mechanical or electronic line leak detectors;and in-tank liquid level probes(if used for leak detection).In the <br /> space provided,note the date this Site Plan was prepared. <br />