My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_1986-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 1:44:19 PM
Creation date
6/23/2020 6:53:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2000
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_1986-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> =N MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before maldng the change. <br /> Required by Sections 2632(d) and 2641(h) CCR <br /> Facility Name State of California-- Department of Highway Patrol <br /> Facility Address x'330',N. 'Ad. Art`"; Road, Stockton, CA 9520870466 <br /> A. Describe the frequency of performing the monitoring: <br /> Tank Second Wednesday of every month. <br /> Piping Annuall <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank Gilbraco Model TLS-350 UST Monitor <br /> Piping Such equipment as utilized by professional service providers (i.e. <br /> Stockton Service Station Equipment) . <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> Gilbraco monitors stem located in Automotive Maintenance office. <br /> See plot plan). <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> Neil Mekeel Automotive Technician <br /> Richard Anderson Automotive Technician <br /> E. Reporting format for monitoring: <br /> Tank Gilbraco printout and summary statement <br /> Pipin As provided by contract service. <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months: Annual testing and certification by contract <br /> provider. <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: Operation instructions provided by literature <br /> accompanying the monitoring rrninina by experienced <br /> employees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.