Laserfiche WebLink
TANK # I #I #i I I# <br />CAPACITY j ' 'k­� <br />MANUFACTURER l OAJ <br />COMPOSITION f <br />MODEL �+ <br />PRODUCT <br />CORROSION PROTECTION <br />U.L. LISTED <br />COMPATIBILITY WITH 100% <br />METHANOL <br />13. TANK(s) TO BE INSTALLED <br />_ <br />A. Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />_ <br />B. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />_ (2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />_ C. Non -clad steel tank [Section 2635 (a) (2) (A)l <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers <br />etc.). <br />(2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />5 <br />r <br />'UST SYSTEM DRAWING INFORMATION <br />of (include manufacturer's specification sheets for proposed equipment to be <br />installed). <br />1. <br />Three complete sets plans <br />2.ans <br />drawn to scale in non -erasable print. <br />3. <br />Plot plan to show location of tanks and all associated piping. <br />Striker or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />4. <br />plates <br />5. <br />Tank cross-sectional diagram. <br />6. <br />Z Detail of tank, associated piping, excavation and cover. <br />approved by a nationally recognized independent testing organization. [Title 23, <br />Chapter 16, <br />7 <br />Tank(s) and piping <br />Article 3, Section 2631 (b) & 26351 <br />Verification of product compatibility with the tank(s), piping, monitoring <br />8. <br />device(s), epoxy or silicone glues, etc. <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />9. <br />installation site, prior to installation, a tightness test shalt be performed on both primary <br />(1°) and <br />10 <br />At the <br />secondary (2') containment systems before covering. [Section 2635 (a) (3) & (4)l <br />Tank integrity test required upon completion of installation with tank in operating condition. Test <br />facility. [Health & Safety Code, <br />results to be <br />Division 20, <br />11. <br />submitted directly to PHS -END from the testing company or owner of <br />Chapter 6.7, Section 25291 (h)] <br />12. <br />TANK COMPOSITION <br />TANK # I #I #i I I# <br />CAPACITY j ' 'k­� <br />MANUFACTURER l OAJ <br />COMPOSITION f <br />MODEL �+ <br />PRODUCT <br />CORROSION PROTECTION <br />U.L. LISTED <br />COMPATIBILITY WITH 100% <br />METHANOL <br />13. TANK(s) TO BE INSTALLED <br />_ <br />A. Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />_ <br />B. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />_ (2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />_ C. Non -clad steel tank [Section 2635 (a) (2) (A)l <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers <br />etc.). <br />(2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />5 <br />