My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2001-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:23 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2004
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2001-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. INTERSTITIAL SPACE MONITORING <br />A. Visual monitoring [Section 2632 (c) (1)l <br />(a) Exterior surface and floor beneath tank monitored by direct viewing <br />(b) Daily visual inspections <br />_ (c) Liquid level in tank to be recorded at time of inspection <br />_ (d) If liquid observed around or beneath primary tank, owner will determine if an unauthorized release <br />has occurred. <br />B. Mechanical or electronic monitoring [Section 2632 (c) (2)) <br />(a) Continuous monitoring system connected to an audible and visual alarm system. <br />Monitoring equipment to be installed <br />Manufacturer- <br />Model Number:_ <br />Sensor Type: VaporLiquid Both. <br />ogMk <br />Sensor/Panel specifications. <br />Location(s) for sensors: <br />Tank: Piping' <br />Dispenser' <br />C. Monitoring and response plan submitted [Section 2632 (d) (1) & (2)]. <br />15. Any special accessories, fittings, coatings, or linings not inherent within the initial design of the 10 tank or <br />double-wall UST. [Section 2631 (b)] <br />A. Approved by a nationally recognized independent testing organization. <br />B. Demonstration of integrity with the primary and/or. secondary containment. <br />2 <br />D Alternate construction <br />. . <br />9 n for new underground storage tanks conta ing motor vehicles fuel [Section 26331. <br />(1) <br />Monitoring and response plan [Section 26341. <br />(2) <br />Underground storage tank composed of.... <br />(a) Fiberglass reinforced plastic. <br />(b) Cathodically protected steel. <br />(c) Steel clad with fiberglass reinforced plastic. <br />(d) Other material that complies with section 2631 and 2632. <br />(3) <br />Floor of leak interception and detection system constructed on a firm base and sloped to a <br />_ <br />collection sump (use of membrane liners comply with section 2631 (d) (6) requirements.) <br />(4) <br />Access casings installed in the collection sump of the secondary containment system with <br />the following: <br />backfill in the interstitial space. The access casing shall meet all of <br />Designed and installed to allow the liquid to flow into the casing. <br />Sized to allow removal of collected liquid and able to withstand all anticipated applied <br />stresses. <br />Constructed of material that will not be structurally weakened. <br />Screened along entire vertical zone of permeable material. <br />Capable of preventing leakage of any hazardous substance from the casing. <br />Extend to the ground surface and covered with a locked waterproof cap. <br />Capable of meeting S.J. Co. PHS-EHD Well Standards. <br />Leak interception and detection system shall prevent the leaked hazardous substance from <br />entering ground water. <br />14. INTERSTITIAL SPACE MONITORING <br />A. Visual monitoring [Section 2632 (c) (1)l <br />(a) Exterior surface and floor beneath tank monitored by direct viewing <br />(b) Daily visual inspections <br />_ (c) Liquid level in tank to be recorded at time of inspection <br />_ (d) If liquid observed around or beneath primary tank, owner will determine if an unauthorized release <br />has occurred. <br />B. Mechanical or electronic monitoring [Section 2632 (c) (2)) <br />(a) Continuous monitoring system connected to an audible and visual alarm system. <br />Monitoring equipment to be installed <br />Manufacturer- <br />Model Number:_ <br />Sensor Type: VaporLiquid Both. <br />ogMk <br />Sensor/Panel specifications. <br />Location(s) for sensors: <br />Tank: Piping' <br />Dispenser' <br />C. Monitoring and response plan submitted [Section 2632 (d) (1) & (2)]. <br />15. Any special accessories, fittings, coatings, or linings not inherent within the initial design of the 10 tank or <br />double-wall UST. [Section 2631 (b)] <br />A. Approved by a nationally recognized independent testing organization. <br />B. Demonstration of integrity with the primary and/or. secondary containment. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.