Laserfiche WebLink
Jan.23. 2015 12:33PM RUMEX CONSTRUCTION No.9417 P. 5/8 <br />0 IS <br />SWRCB, January 2002 Page — of <br />9. SPELL/OVERFILL CONT 1V. BOXES <br />Facility is Not Equi ed With Spill/Overfill Containment Boxes 0 <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 0 <br />Test Method Developed By: 0 Spill Bucket Manufacturer 71ndustry Standard 0 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: 0 Press= 0 vacuum Fx1 Hydrostatic <br />0 Other (Spee6) <br />Test Equipment Used: I Equipment Resolution: <br />Comments — (Lnehdo information, on repairs made prior to testing, and recommended fbllow-upfar failed tests).. <br />87 Bucket failed the first attempt, Replaced uV and retest PASSED <br />Spill Box# 87 <br />"ox# <br />1V <br />7 <br />Spill Box # 87 Retest SPM ]BOX# <br />Bucket Diameter, <br />Bucket Depth: <br />13" <br />13f$ <br />Wait time between applying <br />preamre/vacuum/water and <br />S!ajt�n test: <br />AN2 3 2015 <br />ENV <br />Test Start Time: <br />9-30 <br />10:45 14!=A <br />'ri-i r�imjAorqMKIT <br />Initial Reading (Ri): <br />9314" <br />91/4" <br />Test End Time. <br />10:30 <br />11,45 <br />Find Reading (Rx): <br />91, <br />91/4" <br />Test Duration: <br />I hour <br />I hour <br />Change in Reading (RF-Ri): <br />Y4" <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />Test Pxsalt: <br />Opass X van <br />xPass OF 0 Fail <br />0 Pass 0 Fail <br />Comments — (Lnehdo information, on repairs made prior to testing, and recommended fbllow-upfar failed tests).. <br />87 Bucket failed the first attempt, Replaced uV and retest PASSED <br />