My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2005-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:24 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2018
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2005-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan.23. 2015 12:34PM RUMEX CONSTRUCTION <br />0 <br />SWRCB' January 2002 <br />f #w - 4 0 . <br />0 No. 9417 P. 6/8 <br />aill/Overfill Containment Boxes are Present, but were Not Tested 0 JAN 2 3 2015 <br />Test Method Developed By: D Spill Bucket Manufacturer 0 Industry Standard <br />0 Other (Spew)D VROAMENT) <br />Test Method Used: 0 Pressure 0 varmurn <br />0 Other (Spaeify) <br />Test Equipment Used: moan Sump Tester Eqaipment Resolution: <br />Bucket Diameter <br />Spill Box# <br />Spill Box # <br />Spffl Box # <br />Spill Box# <br />Bucket Depth: <br />Wait time between applying <br />pressurelvacuum/water and <br />starting tat: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Test Stan Time. <br />Initial Reading (It.,): <br />Test End Time: <br />Final Reading (Rp): <br />Test Duration: <br />15min <br />15 Minutes <br />15 Minutes <br />15 minutes <br />Change in Reading (R);-Ri): <br />Pass/Fail Threshold or <br />Criteria: <br />0 PUS - 0 Fan <br />0 Pass � Q Fail <br />D'Tass 0 Fail <br />0• Pass 0 Fall _j <br />. Comments — (indude information on repairs Made prior to testing, and recommendedfollou-ypforfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.