Laserfiche WebLink
Jan.23. 2015 12:34PM RUMEX CONSTRUCTION <br />0 <br />SWRCB' January 2002 <br />f #w - 4 0 . <br />0 No. 9417 P. 6/8 <br />aill/Overfill Containment Boxes are Present, but were Not Tested 0 JAN 2 3 2015 <br />Test Method Developed By: D Spill Bucket Manufacturer 0 Industry Standard <br />0 Other (Spew)D VROAMENT) <br />Test Method Used: 0 Pressure 0 varmurn <br />0 Other (Spaeify) <br />Test Equipment Used: moan Sump Tester Eqaipment Resolution: <br />Bucket Diameter <br />Spill Box# <br />Spill Box # <br />Spffl Box # <br />Spill Box# <br />Bucket Depth: <br />Wait time between applying <br />pressurelvacuum/water and <br />starting tat: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Test Stan Time. <br />Initial Reading (It.,): <br />Test End Time: <br />Final Reading (Rp): <br />Test Duration: <br />15min <br />15 Minutes <br />15 Minutes <br />15 minutes <br />Change in Reading (R);-Ri): <br />Pass/Fail Threshold or <br />Criteria: <br />0 PUS - 0 Fan <br />0 Pass � Q Fail <br />D'Tass 0 Fail <br />0• Pass 0 Fall _j <br />. Comments — (indude information on repairs Made prior to testing, and recommendedfollou-ypforfailed tests) <br />