Laserfiche WebLink
Feb.26. 2013 10:29AM RUMEX CONSTRUCTION <br />SWRC8, lanuary 2002 0 <br />6. PIPING SUMP TESTING <br />No, 8254 P. 5 <br />Page — of <br />Test Method Developed By, 0 Sump Manufacturer 0 Industry Standard D Professional Engineer <br />0 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum 0 Hydrostatic <br />a Other (Spec6) <br />Test Equipment Used: Incon Sump Tester <br />Equipment Resolution: +/- 0.002 <br />Sump 197 Sump a <br />Sump # Sump # <br />Sump Diameter: 3711 <br />Sump <br />Sump Depth; <br />48" <br />Sump Material: <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Pi in penetration: <br />17" <br />Height from Tank Top to Lowest <br />101' <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Good <br />Portion of Sump Tested' <br />Highest Penetration <br />Highest etration <br />Pen <br />Penetration Highest Highest Penetration <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />XYes DNo DNA <br />oYes ONo DNA <br />0 Yes 0 No 0 NA 0 Yes D No 0 NA <br />product and water)?' <br />Turbine shutdown response time <br />NA <br />Is system programmed for fail-safe <br />shutdown?" <br />x Yes 0 No 0 NA <br />0 Yes D No 0 NA <br />0 Yes 7 No 0 NA 0 Yes 0 No 0 NA <br />Was fail-safe verified to be <br />operational?* <br />xYes DNo [INA <br />OYes DNo 0 N <br />0 Yes C No 0 NA ❑0 Yes ❑0 No D NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />30 Minutes <br />30 Minutes <br />30 Minutes 30 Minutes <br />test: <br />-Test Start Time. <br />11-.561 <br />-Initial Reading <br />6.35371 <br />Test End Time: <br />12.111 <br />FM Reading (RF); <br />63537.1 <br />FTest Duration: <br />15 win, 115 min. <br />15 min. 115 min. <br />19 min. 115 min. 15 min. 15 min. <br />Change in Reading <br />.00051 <br />-Pass/Fail Threshold or Criteria; <br />.002 <br />.002 <br />.002 .002 <br />Test Result: <br />x Pass 0 Vail <br />0 Pass 0 Fail <br />0 Pass D)Fa" 0 Pan ". 11 Fall <br />Was sensor removed for testing? <br />XYes nNo DNA <br />DYes DNo DNA <br />DYes 0 N [INA 0Yes DNo DNA <br />Was sensor properly replaced and <br />Verified functional ager testin? <br />X Yes D N o [INA <br />I <br />OYes 0 N DNA <br />0 Yes 0 No 0 NA DYes 0 N DNA <br />I I <br />. Comments — (anclude Fq�rination on repairs made prior to testing, and recommendedfollow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (1) is "NO"or"NA!', the entire sump must be tested. (See SWRC8 LO -160) <br />