My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2005-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:24 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2018
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2005-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feb, 26. 2013 10:29AM <br />SWP,C)3, January 2002 <br />RUMEX CONSTRUCTION <br />0 0 <br />5. SECONDARY PIPE TESIING <br />No, 8254 P, 4 <br />Page — of <br />Test Method Developed By; <br />0 Piping Manufacturer 0 Industry Standard <br />0 Other (Spew) <br />0 Professional Engineer <br />Test Method Used: <br />D Pressure <br />0 Other (Spew) <br />0 Vacuum <br />0 Hydrostatic <br />Test Equipment Used. Pressure Gauges <br />Piping Run 87 prod <br />Piping <br />Piping Material <br />Material:Plastic <br />7PI!pingM�EmLnufacturer: <br />Equipment Resolution: 0.5% of dial <br />Piping Run 87 vapor Piping Run Piping Run <br />Plastic <br />Environ/flex <br />Smith <br />Piping Diameter: <br />1.514 <br />211 <br />Length of Piping Run: <br />27' <br />30° <br />Product Stored: <br />87 <br />87 vapors <br />Method and location of <br />p1Lmg-run isolation: <br />Air Valve <br />Air Valve Air Valve <br />Air Valve <br />Wait time between applying <br />pressure/vacuum/water and <br />staMng test: <br />30 Minutes <br />30 Minutes 30 Minutes <br />30 Minutes <br />Test Start Time: <br />loam <br />loam <br />Initial Reading (RO: <br />5 psi <br />5 psi 5 psi <br />5 psi <br />Test End Ti <br />Ilarn <br />llarn <br />Final Reading (RF); <br />5 psi <br />5 psi <br />Test Duration: <br />I hr <br />I hr <br />Change in Reading (Rf-14): <br />0 <br />0 <br />Pass/Ml Threshold or <br />Criteria: <br />0 <br />I <br />0 0 <br />0 <br />L', X Pass 0 Fail <br />X pass,'; 11, 0 Pass 0 Fail 0 Pass •'0'' Pau <br />Comments — (include information on repairs made prior to testing, and recommendedfollow-up <br />for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.