Laserfiche WebLink
i' <br />Feb. 6. 2012 8.38AM RUMEX CONSTRUCTION <br />Monitoring System Certification <br />UST Monitoring Site Plan U A 4[] <br />Site Address: `'S <br />a--5td: *jc Et . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />..............:.... > ......... <br />........ai.......7 �r�............. �. ........... <br />....... <br />. <br />. <br />...... . �if'4............. <br />...... .. ,.... <br />....... <br />......,..:: .... I-- .......I....I............. . <br />................... <br />.:.................... .......... <br />. ............I..'' ...................... ........., <br />............................................ I.......... <br />Date flap was drawn: —L&ZI—? <br />instructions <br />If you already have a diagram that shows all required information, you may Include it, rather than this page, with your Monitoring System <br />Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: <br />onitorino system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary <br />containment areas; mechanical or electronic line IeaK detectors; and in -tank liquid level probes (if used for leak detection). In the space <br />provided, note the date this Site Plan was prepared. <br />Monitoring System Certification <br />12107 <br />2 2/21/07 <br />