My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2005-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:24 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2018
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2005-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feb. 6. 2012 8:34AM RUMS CONSTRUCTION <br />No, 1140 P. 5/6 <br />SWRCB, January 2002 Page of <br />Facility is,Not Equipped With SEM/Overfill Containment Boxes ❑ <br />Spill./Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: <br />Bucket Diameter: <br />Equipment Resolution: <br />Spill Box#87 FILL Spill Box # Spill Box# Spill ]Box# <br />11" <br />Bucket Depth: <br />13" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 MINUTES 30 MINUTES <br />Test Start Time: <br />1.:30 <br />Initial Reading A): <br />8" <br />Test End Time: <br />2:30 <br />]Final Reading (Rr): <br />4" <br />Test Duration: <br />1 HOUR 1 HOUR <br />Change in Reading (&-RT): <br />-4" <br />Pass/Fail Threshold or <br />Criteria: <br />.002 .002 <br />Test Result: <br />Pass • X Fail ❑ . ]Pass , ❑Fail .. . <br />ComnieytU — (include in formation on repairs made prior to testing, and recommended follow-up for failed tests) <br />1. NEED TO RIR DRAIN VALVER IN 87 FILL BUCKET & RE -TEST, PER INSPECTOR, NEED TO <br />PULL A PERMIT. BUCKET IS A OPW/POMELO BUCKET W/DRAIN VALVE THAT IS FIELD IN <br />PLACE BY (2) WASHERS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.