Laserfiche WebLink
Feb. 6. 2012 8:34AM RUMS CONSTRUCTION <br />No, 1140 P. 5/6 <br />SWRCB, January 2002 Page of <br />Facility is,Not Equipped With SEM/Overfill Containment Boxes ❑ <br />Spill./Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: <br />Bucket Diameter: <br />Equipment Resolution: <br />Spill Box#87 FILL Spill Box # Spill Box# Spill ]Box# <br />11" <br />Bucket Depth: <br />13" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 MINUTES 30 MINUTES <br />Test Start Time: <br />1.:30 <br />Initial Reading A): <br />8" <br />Test End Time: <br />2:30 <br />]Final Reading (Rr): <br />4" <br />Test Duration: <br />1 HOUR 1 HOUR <br />Change in Reading (&-RT): <br />-4" <br />Pass/Fail Threshold or <br />Criteria: <br />.002 .002 <br />Test Result: <br />Pass • X Fail ❑ . ]Pass , ❑Fail .. . <br />ComnieytU — (include in formation on repairs made prior to testing, and recommended follow-up for failed tests) <br />1. NEED TO RIR DRAIN VALVER IN 87 FILL BUCKET & RE -TEST, PER INSPECTOR, NEED TO <br />PULL A PERMIT. BUCKET IS A OPW/POMELO BUCKET W/DRAIN VALVE THAT IS FIELD IN <br />PLACE BY (2) WASHERS. <br />