Laserfiche WebLink
Feb. 6. 2012 8:35AM <br />SWRCB, January 2002 <br />RUM <br />,iCONSTRUCTION <br />No.1140 P. 6/6 <br />Page <br />of <br />Facility is Not Equipped With Spill/Overfill Containment Boxes D <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer ® Industry Standard, D Professional Engineer <br />❑ Other (Specify) <br />Test Method Used, <br />D Pressure D Vacuum ®.hydrostatic <br />D Other (Specify) <br />Test Equipment Used: Incon Sump Tester <br />Spill Box# Spill Box # <br />Bucket Diameter: <br />Equipment Resolution: <br />Spill Box # Spill Box# <br />Bucket Depth: <br />'t7U'ait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 Minutes 30 Minutes <br />30 Minutes 30 Minutes <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RE): <br />Test Duration: <br />1 hour 15 Minutes <br />15 Minutes 15 Minutes <br />Change in Reading (Rx -RT): <br />Pass/Fail Threshold or <br />Criteria: <br />.002 <br />.002 .002 <br />Test Result: <br />110 Pass 0 Fail D "ass: D Fail <br />D•' Pass D Fail • .: D. Pass, • ❑ k'ail <br />Comments — (include information on repairs madeprior to testing, and recommended follow up forfailed tests) <br />