Laserfiche WebLink
Jan. 21. 2011 2: 09PM RUM X CONSTRUCTION No, 3858 P. 5/6 <br />.:Monitoring System Certification <br />� UST Monitoring Site Pian <br />>' Site Address; t i-�-✓ srT�i' - - <br />4u i <br />ET . . . . . . . <br />...................................... <br />.............. I ... I ........... <br />.................... I........ <br />...........................I........: � ............ <br />.... . ............ <br />.................................... <br />..................................................... <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />....................................................I <br />Date map was drawn: 1 /- <br />Instructions <br />If you already have a diagram that shows al( required information, you may include it, rather than this page, with your Monitoring System <br />Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment if installed: <br />monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary <br />containment areas; mechanical or electronic line leak detectors; and In -tank liquid level probes (if used for teak detectlon). In the space <br />provided, note the date this Site Plan was prepared. <br />Monitoring System Certification <br />92 O7 <br />2 2/21/07 <br />