Laserfiche WebLink
Jan -21. 2011 2:09PM <br />SWRCB, January 2002 <br />RUMEX CONSTRUCTION <br />0 <br />L` <br />No -3858 P. 6/6 <br />Page of <br />Facility is Not uipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 0 <br />Test Method Developed By: 0 Spill Bucket Manufacturer ® Industry Standard C Professional Engineer <br />0 Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum El Hydrostatic <br />❑ Other (Spec) <br />Test lEauiument Used: Incon Sunni Tester Equipment Resolution: <br />Bucket diameter: <br />Spill Box# 87 Fill <br />13" <br />Spill Box # 87 Vapor <br />13" <br />Spill Box # <br />Spill Bos# <br />Bucket depth: <br />12" <br />12" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />9:00am <br />9:008m <br />Initial Reading (R.1): <br />9 1/4' <br />101/2' <br />Test End Time: <br />10:00am <br />10:00am <br />Final Reading (Rr): <br />9 1/4' <br />101/2' <br />Test Duration: <br />1 hour <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />Change in Reading (RF-Rj): <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />PASS <br />PASS <br />.002 <br />.002 <br />Test Result: <br />M Pass ❑ Fafl <br />®Pass ❑ Fall <br />❑ Pass ❑ Fall <br />❑ pass 0 Fail <br />Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />