My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2005-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:24 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2018
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2005-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan -21. 2011 2:09PM <br />SWRCB, January 2002 <br />RUMEX CONSTRUCTION <br />0 <br />L` <br />No -3858 P. 6/6 <br />Page of <br />Facility is Not uipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 0 <br />Test Method Developed By: 0 Spill Bucket Manufacturer ® Industry Standard C Professional Engineer <br />0 Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum El Hydrostatic <br />❑ Other (Spec) <br />Test lEauiument Used: Incon Sunni Tester Equipment Resolution: <br />Bucket diameter: <br />Spill Box# 87 Fill <br />13" <br />Spill Box # 87 Vapor <br />13" <br />Spill Box # <br />Spill Bos# <br />Bucket depth: <br />12" <br />12" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />9:00am <br />9:008m <br />Initial Reading (R.1): <br />9 1/4' <br />101/2' <br />Test End Time: <br />10:00am <br />10:00am <br />Final Reading (Rr): <br />9 1/4' <br />101/2' <br />Test Duration: <br />1 hour <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />Change in Reading (RF-Rj): <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />PASS <br />PASS <br />.002 <br />.002 <br />Test Result: <br />M Pass ❑ Fafl <br />®Pass ❑ Fall <br />❑ Pass ❑ Fall <br />❑ pass 0 Fail <br />Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.