My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2005-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:24 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2018
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2005-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page 3 of 7 <br />Test Method Developed By: <br />❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑Other (Specify) <br />Test Method Used: <br />® Pressure <br />❑ Other (Specify) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: 4.5 GLYCERIN <br />FILLED GAUGE&NITOGEN <br />Equipment Resolution: .5 <br />Piping Material: <br />Piping Run# Fuel <br />Piping Run# Vapor <br />Piping Run# Piping Run# <br />Plastic FRP <br />Piping Manufacturer: <br />Environ <br />Smith <br />Piping Diameter: <br />1.5" <br />3" <br />Length of Piping Run: <br />40' <br />30' <br />Product Stored: <br />Gas <br />Gas <br />Method and location of piping- <br />run isolation: <br />Test Boot Piping Sump <br />Test Boot Fill Sump <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 Minutes <br />15 Minutes <br />Test Start Time: <br />9:15am <br />9:40am <br />Initial Reading (R,): <br />5.2 <br />5.3 <br />Test End Time: <br />10:15am <br />10:40am <br />Final Reading (RF): <br />5.2 <br />5.3 <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (RF-Ri): <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 <br />0 <br />Test Result: <br />Pass❑ Fail ❑ NIA <br />Z Pass❑ Fail ❑ NIA <br />❑ Pass❑ Fail ❑ N/A ❑ Pass❑ Fail ❑ NIA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.