Laserfiche WebLink
7SWRCB, January 2002 <br />Test Method Developed By: <br />Test Method Used: <br />6. PIPING SUMP TESTING <br />❑ Sump Manufacturer <br />❑ Other (Specify) <br />❑ Pressure <br />❑ Other (Specify) <br />Page 4 of 7 <br />Industry Standard ❑ Professional Engineer <br />❑ vacuum ® Hydrostatic <br />Test Equipment Used: INCON STS I Equipment Resolution: .002 1 <br />Portion of Sump Tested' <br />2" Above Piping <br />Penetration <br />Does turbine shut down when <br />sump sensor detects liquid (both ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />product and water)?* <br />Turbine shutdown response time NA <br />Is system programmed for fail-safe ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />shutdown?* <br />Was fail-safe verified to be ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading ft): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testing? <br />15 Minutes <br />9:4219:57 <br />6.804016.8045 <br />9:57110:12 <br />6.804416.8052 <br />2-15 Minute Tests <br />.00041.0007 <br />.0021.002 <br />Pass ❑ Fail <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />❑ Pass ❑ Fail <br />❑ Yes ❑No El NA <br />❑ Yes ❑No El NA <br />❑ Pass ❑ Fail <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />❑ Pass ❑ Fail <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -I60) <br />Sump #1 <br />Sump # <br />Sump # <br />Sump # <br />Sump Diameter: <br />37" <br />Sump Depth: <br />46" <br />Sump Material: <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />20" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />2119 <br />Condition of sump prior to testing: <br />Good <br />Portion of Sump Tested' <br />2" Above Piping <br />Penetration <br />Does turbine shut down when <br />sump sensor detects liquid (both ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />product and water)?* <br />Turbine shutdown response time NA <br />Is system programmed for fail-safe ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />shutdown?* <br />Was fail-safe verified to be ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading ft): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testing? <br />15 Minutes <br />9:4219:57 <br />6.804016.8045 <br />9:57110:12 <br />6.804416.8052 <br />2-15 Minute Tests <br />.00041.0007 <br />.0021.002 <br />Pass ❑ Fail <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />❑ Pass ❑ Fail <br />❑ Yes ❑No El NA <br />❑ Yes ❑No El NA <br />❑ Pass ❑ Fail <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />❑ Pass ❑ Fail <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -I60) <br />