Laserfiche WebLink
7SWRCB, January 2002 <br />9. SPILUOVERFILL CONTAINMENT BOXES <br />0 Page 7 of 7 <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: INCON STS <br />Equipment Resolution:.002 <br />Spill Box #Fill <br />Spill Box #Vapor Spill Box # Spill Box # <br />Bucket Diameter: <br />11" <br />11" <br />Bucket Depth: <br />11.5" <br />12.5" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 Minutes <br />15 Minutes <br />Test Start Time: <br />9:42/9:57 <br />10:58/11:13 <br />Initial Reading (Ri): <br />1.0363/1.0364 <br />1.4174/1.4182 <br />Test End Time: <br />9:57/10:12 <br />11:13/11:28 <br />Final Reading (RF): <br />1.0357/1.0356 <br />1.4184/1.4172 <br />Test Duration: <br />2-15 Minute Tests <br />2-15 Minute Tests <br />Change in Reading (RF-Ri): <br />.0006/.0008 <br />.00011.0001 <br />Pass/Fail Threshold or Criteria: <br />.002/.002 <br />.002/.002 <br />Test Result: <br />® Pass ❑ Fail <br />® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />