Laserfiche WebLink
June 29, 2007 <br />Page 2 <br />Item #21 — "Water in 2 percent containment analyzed & properly disposed of <br />Water discovered in the spill bucket occurred due to recent rains occurring just prior to the <br />inspection performed. To remedy this situation and to satisfy the violation noted in Item #21, the <br />"O" ring was replaced and a suction pump was utilized to remove all excess water. There is no <br />attachment provided for this item. <br />Item #23 — "Designated ted Operator: (a) Statement from UST owner; (c -e) Monthly inspection; (f) <br />Employee training" <br />Please find ATTACHMENT #D (Underground Storage Tank System Owner Statements of <br />Designated UST Operator and Understanding of and Compliance with UST Requirements) to <br />satisfy the violation noted in Item #23. <br />Item #3 — "Current Unified Program Consolidated Forms on file with EHD (Facility and tank <br />form)" <br />This violation was satisfied with previous documentation provided to you. <br />Please telephone me or Lieutenant Greg Ferrero at (209) 943-8666, should you require additional <br />information. <br />S. M. COUTTS, Captain <br />Commander <br />Stockton CHP <br />Enclosure <br />