My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2005-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:24 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2018
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2005-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />7. <br />Test Method Developed By: <br />2 <br />0 UDC Manufact <br />n r-*Ikar /CnanififI <br />11 <br />❑ Industry Standard <br />Page S of _% <br />X Professional Engineer <br />Test Method Used: ❑ Pressure 0 Vacuum X Hydrostatic <br />0 Other:(Specify) <br />Test Equipment Used: MTS Mag Probe W/ TDU Meter <br />Equipment Resolution: .001" <br />UDC # 1/2 <br />UDC Manufacturer: Western IFibeEglass <br />UDC Material: <br />Fiber lass <br />UDC Depth: <br />30" <br />Height from UDC Bottom to Top <br />12" <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />6„ <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />Good <br />testing: <br />Portion of UDC Tested <br />14" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />X Yes ❑ No ❑ NA <br />product and water)?* <br />Turbine shutdown response time <br />3 Seconds <br />Is system programmed for fail- <br />X Yes 0 No ❑ NA <br />safe shutdown?* <br />Was fail-safe verified to be <br />X Yes 0 No ❑ NA <br />o erational?* <br />Wait time between applying <br />pressure/vacuum/water and <br />10 Min. <br />starting test <br />Test Start Time: <br />12:04 <br />Initial Reading (R,): <br />0.000" <br />Test End Time: <br />12:28 <br />Final Reading (RF): <br />0.000" <br />Test Duration: <br />24 Min <br />Change in Reading (RF -RI): <br />:000" <br />Pass/Fail Threshold or Criteria: <br />+/- .004" <br />Test Result: <br />X Pass ❑ Fail <br />Was sensor removed for testing? <br />X Yes 0 No ❑ NA <br />Was sensor properly replaced and <br />X Yes ❑ No ❑ NA <br />verified functional after testing? <br />Comments (include information on repairs made prior to te�ting <br />and recommended follow-up for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. if the answer to aM of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.