Laserfiche WebLink
SWRCB, January 2002 <br />7. <br />Test Method Developed By: <br />2 <br />0 UDC Manufact <br />n r-*Ikar /CnanififI <br />11 <br />❑ Industry Standard <br />Page S of _% <br />X Professional Engineer <br />Test Method Used: ❑ Pressure 0 Vacuum X Hydrostatic <br />0 Other:(Specify) <br />Test Equipment Used: MTS Mag Probe W/ TDU Meter <br />Equipment Resolution: .001" <br />UDC # 1/2 <br />UDC Manufacturer: Western IFibeEglass <br />UDC Material: <br />Fiber lass <br />UDC Depth: <br />30" <br />Height from UDC Bottom to Top <br />12" <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />6„ <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />Good <br />testing: <br />Portion of UDC Tested <br />14" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />X Yes ❑ No ❑ NA <br />product and water)?* <br />Turbine shutdown response time <br />3 Seconds <br />Is system programmed for fail- <br />X Yes 0 No ❑ NA <br />safe shutdown?* <br />Was fail-safe verified to be <br />X Yes 0 No ❑ NA <br />o erational?* <br />Wait time between applying <br />pressure/vacuum/water and <br />10 Min. <br />starting test <br />Test Start Time: <br />12:04 <br />Initial Reading (R,): <br />0.000" <br />Test End Time: <br />12:28 <br />Final Reading (RF): <br />0.000" <br />Test Duration: <br />24 Min <br />Change in Reading (RF -RI): <br />:000" <br />Pass/Fail Threshold or Criteria: <br />+/- .004" <br />Test Result: <br />X Pass ❑ Fail <br />Was sensor removed for testing? <br />X Yes 0 No ❑ NA <br />Was sensor properly replaced and <br />X Yes ❑ No ❑ NA <br />verified functional after testing? <br />Comments (include information on repairs made prior to te�ting <br />and recommended follow-up for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. if the answer to aM of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />