My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2005-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:24 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2018
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2005-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />i'Y iTli7.9'lT 7D it <br />11 <br />Tc -UD r-i-%xrrt yr-imriv'r aTDC1 TF.9TING <br />Page S of -7 <br />Test Method Developed By: E UDC Manufacturer D Industry Standard X Professional Engineer <br />[I Other (Sped) <br />Test Method Used: E Pressure 0 Vacuum X Hydrostatic <br />11 Other (Specify) <br />Test Equipment Used: NITS Mag Probe W/ TDU Meter Equipment Resolution: .001" <br />UDC # 1/2 <br />UDC Manufacturer: <br />Western Fiber lass <br />UDC Material: <br />Fiberglass <br />UDC Depth: <br />30" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />12" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />6" <br />Condition of UDC prior to <br />testing: <br />Good <br />Portion of UDC Tested' <br />14" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />X Yes D No El NA <br />Turbine shutdown response time <br />3 Seconds <br />Is system programmed for fail - <br />safe shutdown 7* <br />X Yes o No [INA <br />Was fail-safe verified to be <br />operational9* <br />X Yes Ei D No [INA <br />X Y <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />10Min. <br />Test Start Time: <br />12:04 <br />Initial Reading (Rt): <br />0.0001, <br />Test End Time: <br />12:28 <br />Final Reading (RF): <br />0.0001, <br />Test Duration: <br />24 Min <br />Change in Reading (RF -RI): <br />.0001, <br />Pass/Fail Threshold or Criteria: <br />+/- .004" <br />Test Result: <br />X Pass 11 Fail <br />Was sensor removed for testing? <br />X Yes D No F1 NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />XYes []No DNA <br />Comments — i <br />on repairs made prior to <br />and recommended. <br />' If the entire depth of the UDC is not tested, specify how much was tested. if the answer to Any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.