SWRCB. January 2002 <br />CHP <br />Stockton, CA <br />01/02/04 <br />5. SECONDARY PIPE TESTING <br />I <br />Page 3 of 7 <br />Test Method Developed By: [ ] Piping Manufacturer [X] Industry Standard [ ] Professional <br />Engineer <br />Piping Run #1 Piping Run #2 Piping Run Piping Run Piping Run <br />mine -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 MIN. <br />5 MIN. <br />Piping Material: <br />Environ <br />Fiberglass <br />Piping Manufacturer: <br />Plastic <br />A.O. Smith <br />Piping Diameter: <br />2 " <br />1 2" <br />Length of Piping Run: <br />75' <br />50' <br />Product Stored: <br />Regular Unlead <br />Vapor Return <br />Method and location of <br />Boot <br />3" x 2" Boot <br />mine -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 MIN. <br />5 MIN. <br />Test Start Time: <br />10:00 A.M. <br />10:00 A.M. <br />Initial Reading (Ri) <br />5 P.S.I. <br />5 P.S.I. <br />Test End Time: <br />11:00 A.M. <br />11:00 A.M. <br />Final Reading f): <br />5 P.S.I. <br />5 P.S.I. <br />Test Duration: <br />1 HOUR <br />1 HOUR <br />Change in Reading (Rf-Rl) <br />-0- Change in 1 <br />Hour <br />-0- <br />Pass/Fail Threshold or <br />Criteria: <br />PASS <br />PASS <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />