My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2005-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:24 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2018
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2005-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB. January 2002 <br />CHP <br />Stockton, CA <br />01/02/04 <br />5. SECONDARY PIPE TESTING <br />I <br />Page 3 of 7 <br />Test Method Developed By: [ ] Piping Manufacturer [X] Industry Standard [ ] Professional <br />Engineer <br />Piping Run #1 Piping Run #2 Piping Run Piping Run Piping Run <br />mine -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 MIN. <br />5 MIN. <br />Piping Material: <br />Environ <br />Fiberglass <br />Piping Manufacturer: <br />Plastic <br />A.O. Smith <br />Piping Diameter: <br />2 " <br />1 2" <br />Length of Piping Run: <br />75' <br />50' <br />Product Stored: <br />Regular Unlead <br />Vapor Return <br />Method and location of <br />Boot <br />3" x 2" Boot <br />mine -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 MIN. <br />5 MIN. <br />Test Start Time: <br />10:00 A.M. <br />10:00 A.M. <br />Initial Reading (Ri) <br />5 P.S.I. <br />5 P.S.I. <br />Test End Time: <br />11:00 A.M. <br />11:00 A.M. <br />Final Reading f): <br />5 P.S.I. <br />5 P.S.I. <br />Test Duration: <br />1 HOUR <br />1 HOUR <br />Change in Reading (Rf-Rl) <br />-0- Change in 1 <br />Hour <br />-0- <br />Pass/Fail Threshold or <br />Criteria: <br />PASS <br />PASS <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.