My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2005-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:24 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2018
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2005-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to gny of the questions indicated with an asterisk (*) is "NO" or <br />"NA", the entire sump must be tested. (SWRCB LG -160) <br />SWRCB. January 2002 <br />Page 4 of 7 <br />CHP <br />Stockton, CA <br />01/02/04 <br />6. PIPING SUMP TESTING <br />Test Method Developed By: <br />[ ] Sump Manufacturer [X] Industry Standard <br />[ ] Professional <br />Engineer <br />[ ] Other (Spec) <br />Test Method Used: <br />[ ] Pressure <br />[ ] Vacuum <br />[X ] Hydrostatic <br />[ Other S eci <br />Test E ui ment Used: CALDWELL LEVEL GAUGE <br />E ui ment Resolution: 0.0025 <br />Sump #1 <br />S mp Diameter: <br />42 INCH <br />Sump Depth: <br />24 INCH <br />Sump Material: <br />FIBERGLASS <br />Height from Tank Top to Top of <br />8 INCH <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />10 INCH <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />DRY <br />Portion of Sump Tested <br />12 INCH <br />Does turbine shut down when sump <br />[X] YES [ <br />] NO <br />[ ] YES [ ] NO <br />[ ] YES[ ] NO <br />[ ] YES [ ] NO <br />sensor detects liquid (both product & <br />[ ] NA <br />[ ] NA <br />[ ] NA <br />[ ] NA <br />water)? <br />Turbine shutdown response time: <br />Is system programmed for fail-safe <br />[ ] YES [ <br />] NO <br />[ ] YES[ ] NO <br />[ ] YES [ ] NO <br />[ ] YES [ ] NO <br />shutdown? <br />[X ] NA <br />[ ] NA <br />[ ] NA <br />[ ] NA <br />Was fail-safe verified to be <br />[ ] YES [ <br />] NO <br />[ ] YES [ ] NO <br />[ ] YES [ ] NO <br />[ ] YES [ ] NO <br />operational? <br />[X] NA <br />[ ] NA <br />[ ] NA <br />[ ] NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />5 MIN. <br />test: <br />Test Start Time: <br />10:15 AM <br />Initial Reading (RI): <br />12 INCH <br />Test End Time: <br />10:45 AM <br />Final Reading <br />12 INCH <br />Test Duration: <br />HALF HOUR <br />Chane in Reading Rf-R1 <br />-0- <br />Pass/Fail Threshold or Criteria: <br />.0005 <br />TestlElssttit: ': <br />[` I PASS' <br />[ ,] FAIL ` <br />[,,]„PASS [ ,l FAIL <br />[ ] PASS � ]FAIL <br />[,I PASS-f ].NO <br />Was sensor removed for testing? <br />[ ] YES <br />[ ] NO <br />[ ] YES [ ] NO <br />[ ] YES [ ] NO <br />[ ] YES [ ] NO <br />NA <br />NA <br />NA <br />NA <br />Was sensor properly replaced and <br />[ ] YES <br />[ ] NO <br />[ ] YES [ ] NO <br />[ ] YES [ ] NO <br />[ ] YES [ ]Nd <br />verified functional after testine? <br />[ ] N/A <br />[ ] N/A <br />[ ] N/A <br />[ ] NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to gny of the questions indicated with an asterisk (*) is "NO" or <br />"NA", the entire sump must be tested. (SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.