Laserfiche WebLink
SWRCB. January 2002 <br />CHP <br />Stockton, CA <br />1/02/04 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Page 7 of 7 <br />Facility is Not Equipped With Spill/Overfill Containment Boxes [ ] <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: [ ] Spill Bucket Manufacturer [X ] Industry Standard [ ] Professional Engineer <br />Other S eci <br />Test Method Used: [ ] Pressure [ ] Vacuum [X] Hydrostatic <br />LAKE TEST Other S eci LAKE TEST <br />Test Equipment Used: Hydrostatic Equipment Resolution: <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />s <br />Spill Box #1 <br />Spill Box #2 <br />Spill Box # <br />Spill Box # <br />Bucket Diameter: <br />12" <br />12" <br />Bucket Depth: <br />12" <br />12" <br />Wait time between <br />applying <br />5 MIN. <br />5 MIN. <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />10:30 AM <br />10:30 AM <br />Initial Reading (Rl): <br />8" <br />8" <br />Test End Time: <br />11:00 AM <br />11:00 AM <br />Final Reading (Rf): <br />8" <br />8" <br />Test Duration: <br />HALF HOUR <br />HALF HOUR <br />Change in Reading (Rf-Rl) <br />-0- <br />-0- <br />Pass/Fail Threshold or <br />-0- <br />-0- <br />Criteria: <br />Test Res -nit. <br />t �[Xl=Pass I Fail <br />' <br />IXl Pass . [ . l Fail <br />� f 1 Pass 1 1 Fail <br />1, ] Pass ( IF ail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />