Laserfiche WebLink
SWRCB. January 2002 <br />CHP <br />Stockton, CA <br />1/02/04 <br />8. FILL RISER CONTAINMENT SUMP TESTING <br />Page 6 of 7 <br />Facility is Not Equipped With Fill Riser Containment Sumps <br />Fill Riser Containment Sumps are Present, but were Not Tested [ ] <br />Test Method Developed By: <br />[ ] Sump Manufacturer [X] Industry Standard [ ] Professional Engineer <br />[ ] Other (Specify) <br />Test Method Used: <br />[ ] Pressure [ ] Vacuum [X ] Hydrostatic <br />[ ] Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />Fill Sum # Fill Sum # <br />Fill Sum # Fill Sum # <br />Sump Diameter: <br />42 INCH <br />Sump Depth: <br />25 INCH <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />I 1 INCH <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />12 FT <br />Condition of Sump prior to <br />testing: <br />DRY <br />Portion of Sump Tested <br />14 INCH <br />Sump Material: <br />Fiberglass <br />Wait time between applying <br />pressure/vacuum/water & starting <br />test <br />5 MIN. <br />Test Start Time: <br />10:30 AM <br />Initial Reading (111): <br />14 INCH <br />Test End Time: <br />11:30 AM <br />Final Reading <br />14 INCH <br />Test Duration: <br />HALF HOUR <br />Chane in Readin f -RI) <br />Pass/Fail Threshold or Criteria: <br />-0- <br />Test Result: <br />4X I PASS I I FAIL PASS, ; FAIL <br />PASS , - - FAIL PASS I I FAIL > <br />Is there a sensor in the sump? <br />[X]Yes[ No INA Yes No INA <br />Yes ] No NA Yes No NA <br />Does the sensor alarm when either <br />product or water is detected? <br />[ ] Yes [ ] No [ INA [ ]Yes [ ] No [ INA <br />[ ] Yes [ ] No [ INA [ ] Yes [ ]No [ ] NA <br />Was sensor removed for testing? <br />[X ] Yes [ ]No[ ] [ ] Yes [ ] No [ ]N/A <br />NA <br />[ ] Yes [ ] No [ ] N/A [ ] Yes [ ]No[ ] N/A <br />Was sensor properly replaced and <br />verified functional after testing? <br />I [X ] Yes [ ] No [ ] [ ] Yes [ ] No [ ] N/A <br />NA i <br />[ ] Yes [ ]No[ ]N/A [ ] Yes [ ] No [ ]N/A <br />I I <br />Comments — (include information on repairs made prior to testing, and recommended tollow-up Tor tailed tests) <br />