Laserfiche WebLink
04/05/2010 10:17 209-465-4988 HMC PAGE 04/05 <br /> SWRCE.January 2002 Page..—_.of <br /> 6. PIPING SIJW TESTING <br /> Test Method Developed By. 0 Sump Manufacturer X Industry Standard 0 Professional Engineer <br /> 1")Other(Specify) <br /> 'rest Methal 7ed,--- 0 Pressure 0 Vacuum X Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used:INCON TS STS Equipment Resolution:.000 1" <br /> Sump#87 Sump#91 Sump#DSL Sump# <br /> Sump Diameter. 42 42 42 <br /> Sump Depth: 48 48 48 <br /> Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Height from'rank Top to Top of <br /> 16" 16" 16" <br /> Highest Piping Penetration: --- <br /> Height from Tank Top to Lowest 2491 24" 24" <br /> Electrical Penetration* <br /> Condition of sump prior to testing: GOOD GOOD GOOD <br /> Portion of Sump Tested' 18" 18" 18" <br /> Dm turbine shut down when <br /> sump sensor detects liquid(both DYes ONo DNA 0 Yes ("No DNA D Yes ONO DNA 0 Yes 0 No 3 NA <br /> product and water)'" <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe 0 Yes 0 No 0 NA 0 Yes ONO DNA 0 Yes OKo DNA 11 Yes 0 No D NA <br /> shutdown?' <br /> Was fail-safe verified to be 0 Yes 0 No 0 NA 0 Yes I.]No 1-1 NA Fj Yes ONO DNA OYes ONO, DNA <br /> Operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: 1317 1018 1249 <br /> Initial Reading(RO: 3.9937 3.64" 5.5204 <br /> Test End Time: 1333 1033 1304 <br /> Final Reading(RF): 3.9944 3.6491 5.5203 <br /> Test Duration: 15 MIN 75 MIN' 15 MIN <br /> Change in Reading(RrR,): 0.0007 0.0001 0.4007 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 <br /> Test Result X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail 0 pass 0 Fail <br /> Wassensor removed for testing? 1;,,N Yes 0 No cl NA f Yes 0 No :i NA Yes I i No f],NA 0 Yes 0 No 0 NA <br /> Was sensor properly replaced and VYes .0 No 0 NA ZYes ONO 'INA .5 Yes ONO DNA G Yes 0 No 0 NA <br /> verified functional after testing? <br /> Comments—(include in <br /> formalion on repairs made prior to le-ifing and recommended fbflow-Mfbr)ailed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to Lnv of the questions indicated with an <br /> asterisk M is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-150) <br />