My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14971
>
2300 - Underground Storage Tank Program
>
PR0231911
>
COMPLIANCE INFO_2003-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
6/23/2020 6:53:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2011
RECORD_ID
PR0231911
PE
2361
FACILITY_ID
FA0000540
FACILITY_NAME
COUNTRYSIDE LIQUORS & GAS
STREET_NUMBER
14971
Direction
N
STREET_NAME
STATE ROUTE 88
City
LODI
Zip
95240
APN
06316025
CURRENT_STATUS
01
SITE_LOCATION
14971 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231911_14971 N HWY 88_2003-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X410512010 10:17 209-465-4988 HMC PAGE 03/05 <br /> SWRCB,January 2002 Page_of <br /> 5. SECONDARY PEPE TESTING <br /> Test Method. reveloped By: '3 Piping Manufacturer X Industry Standard Fj Professional Engineer <br /> 0 Other(Sped) <br /> Test Method Used: X Pressure Ell Vacuum 0 Hydrostatic <br /> D Other(Spec6) <br /> Test Equipment Used:NITROGEN Equipment Resolution: Psi <br /> Piping Run#87 Piping Run#91 Pipin: Run# <br /> Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Piping Manufacturer, AMERON AMERON AMERON <br /> Piping Diameter. 3" 3'* 3" <br /> Length of Piping Run: 50, 50, <br /> Product Stored: FUEL FUEL FUEL <br /> Method and location of <br /> piping-run isolation: BOOTED,SUMPS BOOTED,SUMPS BOOTED,SUMPS <br /> Wait time between applying <br /> pressure/vacuum!water and <br /> starting test: <br /> Test Start Time: 0943 0943 1145 <br /> Initial Reading(RO: 3 Psi 3 Psi 3 psi <br /> Test End Time: 1043 1043 1245 <br /> Final Reading(RF): 3 psi 3 psi 3 psi <br /> Test Duration: I 14R lHR I HR <br /> Change in Reading(RF-Rj): 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Test Result: X Pass 0 Fail X Pass D Fall X Pass 0 Fall 0 Pass 0 Fail <br /> CommentS—(inclade iptrinadon onrepairs madept-lor to testing,and recantm Lndedlolletw-up.forfailedtflsl.v) <br />
The URL can be used to link to this page
Your browser does not support the video tag.