Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2) 1A An CAI n <br /> TYPE OF ACTION ❑ I.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL.FOR ALL USTs AT THIS FACILITY. ENTAL HEALN <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION _ <br /> FACILITY ID#(Agency Use Only) ' <br /> BUSINESS NAME(Same as FACILITY NAME)ARCO 05450 3 <br /> BUSINESS SITE ADDRESS 1617 W FREMONT 103CITY STOCKTON 104 <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers' instructions,or annually,whichever is more frequent;and that such work must be performed by qualified personnel. <br /> (23 CCR§2632,2634,2638,264 - <br /> ---- ----------- -- -- -- ---- --------------- ---- -- -- - ---3a <br /> MONITORING EQUIPMENT IS SERVICED ® I.ANNUALLY El 99.OTHER(Specify): 490-3a <br /> Y)� -490-46 <br /> III.MONITORING LOCATIONS <br /> ®1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV,TANK MONITORING'IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> ______---------_ _ _ __ _-_-____________-____________-____-_-490-7._'______-__-________________-_-____-__-.___- 490-8 <br /> PANEL MANUFACTURER VEEDEI' ""0T MODEL#: TLS-3508 <br /> ----------- -------- --------------------------- --- ------- - ----- ------ <br /> 490-9. 1 490-10 <br /> LEAK SENSOR MANUFACTURER: V MODEL#(S): 794390-409 490-11 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)S' LL TANK(S).(23 CCR§2643) 490-13 <br /> PANEL MANUFACTURER: * . -11 MODEL#: <br /> ------------------------------------------------ 490-14 <br /> -------------------------------------- <br /> - <br /> IN-TANK PROBE MANUFACTURER: MODEL#(S): 490-15 <br /> ----------------------------------------------------------- ---------------------------------------------------------------------------------- <br /> LEAK TEST FREQUENCY: ❑ a I D.DAILY/NIGHTLY ❑ c.WEEKLY ago-16 <br /> ❑ d. ®4 e.OTHERS cif 490-17 <br /> Y - (Specify): - - ------ ------------------ <br /> ----------------- -------- --- - - <br /> PROGRAMMED TESTS: ❑ a c.OTHER49-1 s <br /> (Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTO 490-20 <br /> ❑ 90-21 <br /> 4.WEEKLY MANUAL TANK GAUGINI �i PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS ago-22 <br /> F15.TANK INTEGRITY TESTING(23 CCR§2643.1): (UjI SU 1 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY c.OTHEK ecif 490-24 <br /> Q ❑ t N Y)� 490-25 <br /> 49-26 <br /> ❑99.OTHER (Specify): 4900-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHODS)(Cheek all that apply) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY [1b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER-VACUUM 49°-z9 <br /> ---------------------------- ---------- -------------------- ---------------- <br /> 490-30 ------ <br /> '- <br /> PANEL MANUFACTURER:VEEDER ROOT _ MODEL#: TLS-350R 490-31 <br /> 490-32 490-33 <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT 1 MODEL#(S):-794380-323 -- <br /> --- ----------------------------------------------------------------------------------- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR X2636) -- -_ 490-36 <br /> MILLI)MANUFACTURER(S): ago-37 MODEL#(S): 490-38 <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ---------------------------------- ---------- --- ------ ---- -- <br /> ELLD MANUFACTURER(S): VEEDER ROOT ago-ao. MODEL#(S): PLLD 490-411 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049 <br /> *Allowed for monitonn of unburied emergmcy generatorfuel pipingonly per HSC§25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-52 <br /> 490-s 1 <br /> ❑ 99.OTHER(Specify) 490-53 <br /> Arco 05450,Belshire Environmental Services <br />