Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page I of 2) MAR <br /> TYPE OF ACTION ❑ I.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME)ARCO 05450 3- <br /> BUSINESS SITE ADDRESS 1617 W FREMONT 103 CITY STOCKTON 104. <br /> 11.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCR2632�2634,2638,2641) - <br /> - ---------------------------------------------------------------------------------------- ----------------------- <br /> MONITORING E Uy):IS SERVICED 1.ANNUALLY Eleci <br /> 99.OTHER S f 490-30. <br /> Q ® ( p y)� 490-36 <br /> III.]MONITORING LOCATIONS <br /> ®1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USIN G THE FOLLOWING METHOD(S): <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> 490-Z ; 490-8 <br /> PANEL MANUFACTURER: VEEDER ROOT : MODEL#: TLS-350R <br /> ---------------------------------------------------------------------------------------------------------- --- <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT 490-9. MODEL#(S): 794390-409 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-11 MODEL#: 490-13 <br /> --- -- ----------------------------------- - - - - ----------------------------------------------------------- <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15 <br /> ---------------------------------------------------------------------------------------------- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> --- ------ -------- ------ ---- - -- --- ----- ------------------------ ---------------------------.___.----_-- <br /> 490-i <br /> PROGRAMMED TESTS: a.0.1g�P h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-9 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> El4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS Elb.60 HOURS 490-21 <br /> ago-zz <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> 490-24 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> 490-26 <br /> ❑99.OTHER (Specify): 490_27 <br /> V.PIPE 00NITQRING IS PERFORMED,USING THE FOLLOWING METHOD(S),(Cheek all that apply) , <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> -----SECONDARY CONTAINMENT S:®a.DRY [:Ib.LIQUID FILLED ❑c.PRESSURIZED []d.UNDER VACUUM 490-29 <br /> ----------------------------I----------------------------------------------- - - <br /> PANEL MANUFACTURER:VEEDER ROOT 490-30 MODEL#: TLS-350R 490-31 <br /> ----------------------------------------------------------------------------------- <br /> --------------------- <br /> 490-32 490-33 <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT i MODEL#(S)-794380_323 _ - <br /> ---------------------------------------------------------------------------------------------------------- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED123 CCR,§2636)__________________- 490-36 <br /> -------------------- --------- ---------------- --------- <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-38 <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ------------------------------------------------------------ ------------ ------------- ------ <br /> ELLD MANUFACTURER(S): VEEDER ROOT 490-40_ MODEL#(S): PLLD 490 41 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑b.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING 490-45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> *Allowed for monitorin of unburied emergmcy generator fuel piRingonly perHSC§25291.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> 490-52 <br /> ❑ 99.OTHER(Specify) 490-53 <br /> Arco 05450,Belshire Environmental Services <br />