Laserfiche WebLink
MONITORING AND RESPONSE PLAN - SC <br />• ARCO PRODUCTS COMPANY FACILITY WITH <br />DISPENSER SPILL CONTAINMENT DEVICES <br />ARCO Facility: � L s C Address: <br />devicesThis is a monitoring and response plan of action for facilities with spill <br />containment <br />Dispenser spill containment devices [box(es)] are located beneath <br />each dispenser <br />inside the dispenser cabinet. A mechanical sensor is located in the <br />presence <br />impact the dispenser down. <br />I <br />calendarThe containment devices will be inspected according to the <br />manufacturer's instructions by an outside contractor once during each <br />Removedebris from• box. <br />RESPONSEIf any liquid is found, manually close the impact valve, place the I <br />1ispenser "out of service", and call ARCO Maintenance immediatel�j <br />4. •• •>E - CONTAINMENT BOXES <br />OPERATOR RESPONSIBILITIES <br />impactIn the event the • and shuts down a <br />dispenser,• personnel imme• <br />