My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_1987-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 1:41:06 PM
Creation date
6/23/2020 6:53:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2001
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_1987-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Contact ARCO Maintenance or its designated agent by using <br />the telephone number previously provided__ <br />B. Tag the dispenser "out of order" until the liquid has been <br />removed by authorized persons: <br />P <br />ARCO RESPONSIIL ES <br />Method of removing an unauthorized release from the spill <br />containment device: <br />A. Any unauthorized release into the containment box will be <br />removed by ARCO in accordance with California Health and <br />Safety Code requirements. In the event of an emergency, a <br />pumping contractor or truck will be available immediately. in <br />all other cases, equipment availability will be within 12 hours. <br />B. ARCO Maintenance will be responsible for authorizing and <br />selecting contractors for the work to be performed. <br />5. TRAINING <br />All employees must be trained in the subject mentioned in Sections 3 <br />and 4 above. Training needed for the operation of the dispenser <br />containment devices shall include how to inspect the equipment and <br />to manually close the dispenser impact valve. <br />CASTDSC.DOC 6/94 <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.