Laserfiche WebLink
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: Test reducer bootsi..Nitrogen and gauges Equipment Resolution: 0.5%of span <br /> ~�+ M; : <br /> Piping Run# Piping Ran# 2 Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: fl <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of RReducer <br /> 2iping-run isolation: Reducer Boots/Fittings Reducer Boots/Fittings Boots/Fittings Reducer Boots/Fittings <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes I0 minutes 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Ri): �'� <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): 1 t� - G' \C�► l- ( o t f::- ✓t c.;r-1�, <br /> Pass/Fail Threshold or <br /> Criteria: No detectable Loss No detectable Loss No detectable Loss No detectable Loss <br /> Test Result: Pass ❑Fai[ •;l-Pass ❑Fail ff Pass ❑Fail Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-u or ailed tests) <br /> T—'lz7vC 'yrs T-7 S <br /> --Z E3� <br /> I <br /> ------------ <br />