Laserfiche WebLink
7. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑ Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> pTest Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> STP Sump# E' STP Sump#�� STP Sump#`k N_ STP Sump# <br /> Sump Diameter: �•• �g.. <br /> Sump Depth: <br /> Sump Material:_, <br /> Height from Tank Top to Top of <br /> Hi hest Piping Penetration: �/` '��/+ <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No KNA p Yes❑No 1 NA ❑ Yes❑No I NA <br /> roduct and water)?* 11 Yes El No El NA <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?' ❑Yes❑No (SNA ❑Yes❑No NA ❑Yes❑No NA ❑Yes 0 No ❑NA <br /> Was fail-safe verified to be <br /> o erational?' ❑Yes❑No,SNA ❑Yes❑No,0'NA ❑Yes❑No. NA ❑Yes❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes <br /> test: 30 minutes 30 minutes <br /> Test Start Time: <br /> i Initial ReadinR : 20 <br /> g( t) P 4.2 <br /> Test End Time: p•Z,�, r�� 1.2.12 , ,�� t21Z t2Z�i <br /> Final Reading(RF): <br /> Test Duration: 1 �1e✓ 1�e.�� ���� 17��� � <br /> Change in Reading(RF-Ri): �: -. /, O '(p /'.Utv��j - dti�fs f DU[i y <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/_0,002" +/-0.002" <br /> Test Result: Pass ❑Fail �?Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? Yes E]Nn ❑NA HrYes❑No El NA Yes❑No❑NA ❑ Yes❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testi, ? 'T�]Yes❑No ❑NA �r Yes❑No ❑NA ' ff Yes❑No❑NA ❑Yes❑No ❑NA <br /> Comments-(include information on repairs made prior to testing, and recommended ollow-u for failed tests) i <br /> A 01i ii*44,711h' ;i A zl .) LA <br /> yc; •y�' t. <br /> i <br /> i <br /> i <br /> i <br /> ' If the entire-depth of the sump is not tested,specify how much was tested. If the answer to gny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />