My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 1:53:18 PM
Creation date
6/23/2020 6:53:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑ Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> pTest Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> STP Sump# E' STP Sump#�� STP Sump#`k N_ STP Sump# <br /> Sump Diameter: �•• �g.. <br /> Sump Depth: <br /> Sump Material:_, <br /> Height from Tank Top to Top of <br /> Hi hest Piping Penetration: �/` '��/+ <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No KNA p Yes❑No 1 NA ❑ Yes❑No I NA <br /> roduct and water)?* 11 Yes El No El NA <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?' ❑Yes❑No (SNA ❑Yes❑No NA ❑Yes❑No NA ❑Yes 0 No ❑NA <br /> Was fail-safe verified to be <br /> o erational?' ❑Yes❑No,SNA ❑Yes❑No,0'NA ❑Yes❑No. NA ❑Yes❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes <br /> test: 30 minutes 30 minutes <br /> Test Start Time: <br /> i Initial ReadinR : 20 <br /> g( t) P 4.2 <br /> Test End Time: p•Z,�, r�� 1.2.12 , ,�� t21Z t2Z�i <br /> Final Reading(RF): <br /> Test Duration: 1 �1e✓ 1�e.�� ���� 17��� � <br /> Change in Reading(RF-Ri): �: -. /, O '(p /'.Utv��j - dti�fs f DU[i y <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/_0,002" +/-0.002" <br /> Test Result: Pass ❑Fail �?Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? Yes E]Nn ❑NA HrYes❑No El NA Yes❑No❑NA ❑ Yes❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testi, ? 'T�]Yes❑No ❑NA �r Yes❑No ❑NA ' ff Yes❑No❑NA ❑Yes❑No ❑NA <br /> Comments-(include information on repairs made prior to testing, and recommended ollow-u for failed tests) i <br /> A 01i ii*44,711h' ;i A zl .) LA <br /> yc; •y�' t. <br /> i <br /> i <br /> i <br /> i <br /> ' If the entire-depth of the sump is not tested,specify how much was tested. If the answer to gny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.