My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 1:53:18 PM
Creation date
6/23/2020 6:53:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. UNDER-DISPENSER CONTAINMENT C TESTING <br /> ETestIMAethod Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Spec) <br /> Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> z` ° �� `..-€`��'�� �� UDC# P x.,;,, •,„�;,.. _ <br /> 5 5.- •Z LIDO# UDC# .� UDC#�_• . <br /> UDC Manufacturer: �c�tr. ,.,.�. <br /> UDC Material: <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piing Penetration: <br /> .M <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes❑No�NA El Yes❑No P, NA ❑Yes❑No C NA El Yes ElNo,2 NA <br /> product and water)?� <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?• [1 Yes❑No ®NA El ❑No ®"NA ❑ Yes❑No�NA ❑ Yes❑No 9-NA <br /> Was fait-safe verified to be ❑Yes❑No l7•NA ❑Yes❑No NA ❑Yes❑No NA <br /> operational?* El Yes❑Nodi NA <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> startin test <br /> Test Start Time: 2 1 r 2G1� t 2 t 1 rZ , 2gS <br /> Initial Readin (R,): �, �3 CJ✓1 _� <br /> Test End Time: 22b 'LZro 2�L b �• 3q� <br /> Fina! Reading(RF): <br /> Test Duration: ) rtl IS4,N1r �Sc'Mra 7�5r'v 1 <br /> Change in Reading(RF-R,): 0 ,UUi "3` U00;° -P P&? 'UD• �- —.G'U4%t" -+-GU <br /> Pass/Fai I Threshold or Criteria: +/-0.00211 +/-0.002" +/-0.002" +/-0.002" <br /> Test Result: Pass ❑Fail ass ❑Fail ass ❑Fail 'ass ❑Fail <br /> Was sensor removed for testing? Yes❑No ❑NA es❑No ❑NA Yes ❑No ❑NA Yes❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testine? [h Yes❑No ❑NA es❑No ❑NA -91 Yes❑No ❑NA —y—yes❑No ❑NA <br /> COMMCntS—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> "'A"42 Utii� 4 nGtilc: 'I;�%Ltt� ;�i ? ^ "�✓� �r'�ti1� ` , <br /> -' i �')t� r vlC -C tee.- <br /> 'ie� � •� t'Li''�- � G•;)CGI%Yte'�•Ct.t/ �6•�.'l•-><Z•7 !t';27 ..yt•f- �'S�7s <br /> i <br /> F <br /> If tine entire depth of the UDC is not tested',specify how mach was tested. Ifthe answer to an ofthe questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.