My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 1:53:18 PM
Creation date
6/23/2020 6:53:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> Address: 1617 W FREMONT STOCKTON 952032038 Service Date: 10/03/2008 <br /> D. Results of Testing/Servicing <br /> Software Version Installed:328.03 <br /> Complete the fol owinq checklist: <br /> ®Yes ❑No* Is the audible alarm operational? <br /> ®Yes ❑No* Is the visual alarm operational? <br /> ®Yes ❑No* Were all the sensors visually inspected, functionally tested, and cofirmed operational? <br /> ®Yes ❑No* Were all sensors installed at lowest point of secondary containment and positioned so that other <br /> equipment will not interfere with their proper operation? <br /> ❑Yes ❑No* If alarms are relayed to a remote monitoring station, is all communications equipment(e.g. modem) <br /> operational? <br /> ®N/A <br /> ®Yes ❑No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary <br /> containment monitoring system detects a leak,fails to operate,or is electrically disconnected? <br /> If yes:which sensors <br /> initiate positive shut- ®Sump/Trench Sensors ®Dispenser Containment Sensors <br /> ❑N/A down?: <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes ❑No <br /> ®Yes ❑No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no <br /> mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the <br /> ❑NIA tank fill point(s)and operating properly?If so,at what percent of tank capacity does the alarm trigger?: <br /> 90% <br /> 4 <br /> ❑Yes* ®No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment <br /> replaced and list the manufacturer name and model for all replacement parts in Section E below. <br /> Was liquid found inside any secondary containment systems designed as dry systems? <br /> ❑Yes* ®No If yes,check the type(s)of liquid found and describe causes in Section E,below. <br /> 171 Product ❑Water <br /> ®Yes ❑No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports, if applicable <br /> M Yes ❑No* Is all monitoring equipment operational per manufacturers specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments <br /> a' <br /> F <br /> • t. <br /> a <br /> I. <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.