My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 1:53:18 PM
Creation date
6/23/2020 6:53:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> Address: 1617 W FREMONT STOCKTON 952032038 Service Date: 10/03/2008 <br /> F. In-Tank Gauging/SIR Equipment ®Check this box if tank gauging is used only for inventory control <br /> ❑Check this box if no tank gauging or SIR Equipment is installed <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring <br /> Complete the fo owing checklist <br /> ®Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground <br /> faults? <br /> ®Yes D No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ®Yes ❑No* Was accuracy of system product level readings tested? <br /> ®Yes ❑No* Was accuracy of system water level readings tested? <br /> ®Yes ❑No* Were all probes reinstalled properly? <br /> ®Yes ❑No Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H below,describe how and when these deficiencies were or will be corrected <br /> G. Line Leak Detectors (LLD): ❑Check this box if LLDs are not installed <br /> Complete the fo owinq checklist <br /> ®Yes ❑No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD <br /> performance? <br /> ❑N/A Simulated Leak Rate(check all that apply) 03.0 g.p.h ❑0.1 g.p.h ❑0.2 g.p.h <br /> ®Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ®Yes O No* Was the testing apparatus properly calibrated? <br /> ®Yes ❑No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑N/A <br /> ®Yes ❑No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 1 <br /> ❑N/A <br /> ®Yes ❑No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is <br /> disabled or disconnected? <br /> El N/A <br /> For electronic LLDs,does the turbine automaticallyshut off if • <br /> ®Yes D No* malfunctions or fails a test? any portion of the monitoring system <br /> ❑N/A <br /> ®Yes ❑No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑N/A <br /> ®Yes ❑No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H below,describe how and when these deficiencies were or will be corrected <br /> H. Comments <br /> All functions normal on TLS 350 therefore no ground faults present. <br /> There is one electronic&one mechanical leak detector installed. <br /> s <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.