Laserfiche WebLink
SWRCB, January 2002 <br />0 Page 2 of <br />.-i. x AJL A .a.uvxa.. ._. <br />Test Method Developed By. ❑ Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />p Other (Sped) <br />Test Method Used: ❑'Pressure ❑Vacuum 0 Hydrostatic <br />0 Other (Sped) <br />Test Equipment Used: Dial Gauge Equipment Resolution 0-15 psi <br />Piping Run # Piping Run # Piping Run #1 Piping Run # <br />Piping Material: I, <br />Piping Manufacturer: <br />` <br />Piping Diameter. <br />° <br />Length of Piping Run: <br />Product Stored: <br />`i <br />Method and location of <br />Test boot in sump <br />Test boot in sump Test boot in sump Test boot in sump <br />ing-nm isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />30 minutes <br />30 minutes 30 minutes 30 minutes <br />starting test: <br />Test Start Time: <br />'_4a,� <br />' 7 <br />Initial Reading <br />Test End Time: <br />I C717 <br />Z <br />Final Reading (RF): <br />S'" <br />Test Duration: <br />1 hour <br />I hour 1 hour I hour <br />Change in Reading (RFRr}: <br />0 <br />Pass/Fail Threshold or <br />0.00 <br />0.00 0.00 0.00 <br />Test Result: <br />ass 0 Fail <br />Pass ❑ Fail ❑ Pass ❑ Fall ❑ Pass ❑ Fail. <br />Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />Arco #05450 <br />1617 W. Fremont <br />Stockton, Ca <br />Nick Harvey <br /># 10073RSB 989 <br />