Laserfiche WebLink
SWRCB, January 2002 <br />Test Method DevelopedBy: <br />Test Method Used: <br />Test Equipment Used: ELLDS <br />6. PIPING SUW TESTI N U <br />❑ Sump Manufacturer ❑ Industry Standard <br />❑ Other (Spec) <br />❑ Pressure ❑ Vacuum <br />❑ Other (Specify) <br />Sump # Sump 4 <br />Page 3of 11) <br />❑ Professional Engineer <br />❑ Hydrostatic <br />Resohrfion:.0007 <br />G'. <br />Sump Material: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />p <br />f - <br />2" above highest <br />2" above highest <br />Condition of sump prior to testing: <br />❑ Pass ❑ Fail <br />Portion of Sump Testedr <br />2" above highest <br />netration <br />penetration <br />pemetilation <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />product and water\?k <br />❑ Yes ❑ No ❑ NA <br />N/A <br />NIA <br />Turbine shutdown response time <br />NIA <br />Is system programmed for fail-safe <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />shutdown?* <br />❑ Yes ❑ No [INA <br />❑ Yes ❑ No ❑ NA <br />Was fsil-safe verified to be <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />Test Start Time: <br />initial Reading (R): <br />Test End Time: <br />Final Reading CRF): <br />Test Duration: <br />Change in Reading tnF-Kw- _ <br />Pas,VTail Threshold or Criteria: <br />Test Result: <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified fimcdonal after testing? <br />I Sump # <br />2" above highest <br />❑ Yes ❑ No ❑ NA <br />N/A <br />❑ yes ONO DNA <br />❑ Yes ❑No ❑ NA <br />30 minutes 1 30 minutes 1 30 minutes I 30 minutes <br />/2;� <br />i'Y3 <br />15 minutes <br />15 � 4nutes 15 matures 15 minutes <br />A�c _--� <br />0.0020 <br />0.0020 <br />- <br />0.0020 <br />0.002Q <br />.Pass 0 Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ fail <br />Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />a Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />❑ Yes ❑ No (INA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments — (include . ormation on repairs made riot to testing, and recommended follow-Commentsarfailed tests <br />Arco #05450 <br />1617 W. Fremont <br />Stockton, Ca <br />Nick Harvey <br /># 10073R.SH 989 <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to an of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump mustbe tested. (See SWRCB LG -160) <br />