My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2009-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 2:05:50 PM
Creation date
6/23/2020 6:54:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2011
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2009-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SVJRCB, January 2002 <br />C QV 4r 9V" A I2 V PTPTi. TIW..CTjWdI—` <br />Pa0 <br />J of U <br />Page <br />Test Method Developed By. <br />❑ Piping Manufacturer ❑ ludustry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />❑ Pressure <br />❑ Other (S.peczfy) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: Dial Gauge <br />Equipment Resolution: 0-15 psi <br />NONNI= <br />Piping Run # *7 Piping Run # �fPi <br />in Run 1ping Run ft <br />Piping Material: <br />Piping Manufacturer: <br />Piping Diameter: <br />T o o <br />� .. <br />7 <br />Length of Piping Run: <br />Product Stored <br />7 <br />7- <br />Method and location of <br />piping -ran isolation: <br />Test boot in sump <br />Test boot in sump <br />Test boot in sump Test boot in sump <br />Wait time between applying <br />pressurelvacuum/water and <br />starting test: <br />30 minutes <br />30 minutes <br />30 minutes 30 minutes <br />Test Start Time: <br />a: <br />>3 G J= 3 J <br />Initial Reading (Rj: <br />T PS -Z <br />p �' <br />Test End Time: <br />//,F <br />/: <br />- G ! •` f <br />Final Reading (Rr): <br />% fo <br />`✓ /�S �' <br />S �"�` s�J' "" <br />Test Duration: <br />I hour <br />1 hour <br />I hour I hour <br />Change in Reading (RF -R) <br />Pass/Fail Threshold or <br />Criteria: <br />0.00 <br />0.00 <br />0.00 0.00 <br />Test Result: <br />❑ Pass ail <br />❑ Pass KFan <br />VPass ❑ Fail 14 -Pass ❑ Fail <br />Comments ("include information on repairs made prior to testing and recommended, follow-up for failed tests) <br />C 7 4 . w4 tape- 7/!T" <br />Arco #05450 <br />1617 W. Fremont <br />Stockton, Ca <br />Nick Harvey <br /># 10073 SB 989 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.